Floating LNG Terminal Finland Oy, a 100 % subsidiary of Gasgrid Finland Oy, as the terminal operator for the FSRU (Floating Storage and Regasification Unit) vessel Exemplar, which is moored in the port of Inkoo since December 2022 has finalized the scheduling for the Calendar Year 2025.
FSRU Terminal has finalized the scheduling for calendar year 2025. The total number of planned slots for the full gas year were reduced from the preliminary amount of 22 to 19 due to expected market demand.
Out of the total amount of 19 slots 8 Spot Slots are free for reservations. All spot slots reserved before the publication of the last monthly update preceding the quarter during which a scheduled slot is allocated will be considered as part of the joint use concept as described in the Terminal Rules (subject to terminal user acceptance).
Spot capacity invitation for 2025
Floating LNG terminal Finland Oy opens the Spot Allocation Procedure for Q1, Q2, Q3 & Q4 2025 and requests interested parties to submit their Spot Allocation Request´s from 22.10.2024 12.00 Finnish Time. If two or more requests for the same Scheduled Slot fulfil the conditions on the same calendar day, among such requests the Terminal Operator shall prioritize the Applicant on first-come-first-serve basis, according to the time stamp of request email received from an Applicant.
Free Spot Slots for 2025:
| Slot name | Start date | End date [1] | Slot size |
| January II | January 24 | February 15 | 950 GWh |
| March II [2] | March 11 | April 1 | 950 GWh |
| April I | April 2 | April 12 | 950 GWh |
| April II | April 13 | April 23 | 950 GWh |
| August I [3] | August 2 | August 13 | 950 GWh |
| November I [2] | November 5 | November 24 | 950 GWh |
| November II | November 25 | December 14 | 950 GWh |
| December I [2] | December 15 | December 31 | 950 GWh |
| [1] End of gas day is 7:00 on the following day | |||
| [2] Incl. 12-hour terminal maintenance | |||
| [3] Incl. 24-hour terminal maintenance | |||
Kindly note that terminal capacity reservations will be made using the form in Annex 8 of the terminal rules (Annex-8-Form-of-Terminal-Capacity-allocation-request-3.0.pdf (gasgrid.fi)). Also, please submit your company’s relevant documentation as described in Annex 8 and clause 6 of the terminal rules. For Terminal Rules, annexes, contracts etc. concerning spot slots reserved for calendar year 2025 please refer to the rules found under “The terminal regulation contract package for slots allocated to Calendar Year 2025 (1.1.2025-1.1.2026)” (https://gasgrid.fi/en/fsru-en/services/#terminal-regulation)
More information:
Please submit your terminal capacity allocation request form and relevant documentation as described in Annex 8 and clause 6 of the terminal rules by email to rasmus.hellman@gasgrid.fi, benjamin.strandberg@gasgrid.fi and fltf@gasgrid.fi.