Capacity in Balticconnector for the period of 1 February 2021 – 7 February 2021 is published
Balticconnector capacity for the period of 1 Feb 2021 – 7 Feb 2021 will be 33 398 400 kWh/day. Elering, Gasgrid Finland and Conexus have
Balticconnector capacity for the period of 1 Feb 2021 – 7 Feb 2021 will be 33 398 400 kWh/day. Elering, Gasgrid Finland and Conexus have
Gasgrid Finland has published month-specific neutrality charges for 2020, which ensures the neutrality of Gasgrid Finland’s balance management actions. Gasgrid shall not gain or lose
Balticconnector capacity for the period of 25 Jan 2021 – 31 Jan 2021 will be 29 040 000 kWh/day. Elering, Gasgrid Finland and Conexus have
The Transmission System Operators (TSOs) Amber Grid, Conexus Baltic Grid, Elering and Gasgrid Finland organize a Regional Market Development Webinar on Thursday 18th of February
Gas Transmission System Operator invites service providers to bid for Balancing Services for following separate periods: Febrauary 2021 March 2021 The tendered capacities are the
Balticconnector capacity for the period of 18 Jan 2021 – 24 Jan 2021 will be 29 040 000 kWh/day. Elering, Gasgrid Finland and Conexus have
Balticconnector capacity for the period of 11.01.2021 – 17.01.2021 will be 33 398 400 kWh/day. Elering, Gasgrid Finland and Conexus have in cooperation analyzed the
Balticconnector capacity for the period of 4 January 2021 – 10 January 2021 will be 33 398 400 kWh/day Elering, Gasgrid Finland and Conexus have in
Balticconnector capacity for the period of 22 Feb 2021 – 28 Feb 2021 will be 28 399 992 kWh/day. Elering, Gasgrid Finland and Conexus have in
Balticconnector capacity for the period of 22 Feb 2021 – 28 Feb 2021 will be 28 399 992 kWh/day. Elering, Gasgrid Finland and Conexus have in