Consolidated Maintenance Works plan of Baltic – Finnish region for the period from October 2023 to December 2024
Baltic – Finnish region gas transmission system operators AB Amber Grid, Conexus Baltic Grid AS, Elering AS and Gasgrid Finland
Baltic – Finnish region gas transmission system operators AB Amber Grid, Conexus Baltic Grid AS, Elering AS and Gasgrid Finland
The Finnish and Estonian Transmission System Operators (the TSOs), Gasgrid Finland Oy and Elering AS, organize a public consultation concerning
The Finnish Energy Authority has been notified of the guarantees of origin (GO) for gas and hydrogen to be applied
At the request of Gasgrid Finland Oy, the Energy Authority has issued decision 16/071001/2023 (hereafter the “Energy Authority’s decision”) concerning
Cold weather and highly decreased gas energy prices increased the use of gas in the last week of February in
Balticconnector technical capacity offered for the market participants has been 54,6 GWh/day from Estonia towards Finland. As a result of
Last week, coldest weather conditions of this winter so far were experienced, when temperatures reached -20 degrees celcius all the
The cold weather conditions of the last few weeks have significantly increased gas consumption in Finland. During the past autumn,
As the competent authority, the Finnish Energy Authority has confirmed the terminal rules of Floating LNG Terminal Finland Oy (FLTF).
Gasgrid Finland has published the information in accordance with Article 30 of the network code on harmonized transmission tariff structures