Get to know us and our operations
Explore our methane business and its services.
Explore the services and operations of our LNG-terminal.
Explore hydrogen development and hydrogen projects.
Read our newest news, press releases and articles.
25.09.2025
The Inkoo terminal ship FSRU Exemplar has returned from dry dock to Inkoo. The terminal ship left for dry dock as part of normal, pre-planned maintenance on August 15th and is now moored back at the port of Inkoo. Terminal services will resume on 29.9.2025.
The docking went well and ahead of schedule thanks to careful planning and thorough preparation. During the docking, various inspections were carried out on the ship, its electronic systems were updated, and its recertification for the next five-year period was ensured. The ship also received a new coat of paint. During the ship’s absence, maintenance work was also carried out at the Inkoo terminal area. Maintenance work on the ship and terminal area ensures the safe and efficient operation of the terminal ship.
Head of Communications Marjaana Kiviojamarjaana.kivioja@gasgrid.fi+358 40 077 3181
Gasgrid Floating LNG Terminal Finland OyCEO Satu Mattilasatu.mattila@gasgrid.fi+358 45 135 2288